|

PECAN VALLEY PLANTATION & CONFERENCE CENTER – ALBANY, GA
Description: This plantation themed hotel/conference center features 36
holes of golf, 18 of which winds through a square mile of existing
mature pecan trees in a grove that produces over $1 million worth of
pecans annually. The other 18 will be a contrasting links-style course
that meanders throughout an additional 800 acres of grasslands and quail
habitat. Obviously, this acreage comprises a large portion of the
hunting preserve, which is a major feature of the golf and hunting
resort. Albany is the “quail capital” of the nation and the many
plantations along “Plantation Row” have featured excellent quail hunts
for many years. In addition to bird hunting, trap, skeet, and a sporting
clay course for the sportsman are also provided. Also featured are a spa
and wedding facilities, as well as various old plantation experiences
such as a smoke house, carriage rides, formal gardens, and equestrian
activities. Proposed budget: $15 million for 36 holes.
SWINGING BRIDGE GOLF RESORT & CONFERENCE CENTER – BRANSON, MO
Description: This 18-hole golf resort and conference center is located
directly on Table Rock Lake and has over 1.5 miles of frontage. The
signature hole, #17, a par three, sits on a rocky peninsula protruding
into the lake with 20-40 foot cliffs on all sides and a “swinging
bridge” option for golfers who hit the green. A private marina for
residents and hotel guests will also be the terminal for dinner and
cocktail cruises daily to the shows in Branson. Hotel villas, limited
timeshares, and 70 exclusive lots will also complement the 100 room
hotel and 10,000 sq. ft. conference facility. Proposed budget: $8.5
million (hard cost).
ONEOK BALL PARK – TULSA, OK
Description: Attached urban design concept for a downtown ballpark and
surrounding redevelopment resulted in the successful relocation of the
Tulsa Drillers to this site in downtown Tulsa. The design concept and
plan culminated an eight year effort to align diverse neighborhood
interests, the Greenwood Chamber of Commerce, and the necessary
political will to create this ballpark as a part of downtown
revitalization. The ultimate selection of this unique and historic site
along with the adjacent development concepts and opportunities has added
significant redevelopment buzz and vitality, although the ballpark
itself has only been under construction for a few months. Ballpark
budget: $39.2 million.
DIAMOND HILLS GOLF & COUNTRY CLUB – ADA, OK
Description: Very unique 18-hole golf and real estate development
located on 250 acres of perfect golf terrain at the edge of Ada, OK.
Site has great sandy loam soils and gently rolling slopes with specimen
pecan trees scattered about. Lot development totals 186 lots with 83% on
ridges and hilltops looking down on the course. Site also has a +/- 10
acre existing lake for irrigation and is bordered on two sides by future
park land and regional water supply lake. Budget: $4 million.
SKIATOOK LAKE RESORT & CONFERENCE CENTER – SKIATOOK, OK
Description: An 18-hole championship golf course and hotel/conference
center located in the suburban metro Tulsa area. The hotel component
comprises 100 rooms with another 100 rooms located in villas on a ridge
overlooking the 4th and 18th holes. Site has natural waterfalls and rock
outcroppings located among pure strands of blackjack oak and hickory. A
331 boat slip marina complements a 10,000 sq. ft. conference center just
25 minutes from Tulsa International Airport. Although significant
discussion concerning a casino operation adjacent to the hotel has been
ongoing, the development works quite well as an “in town” resort,
conference center, and a business outing type golf course. Proposed golf
budget: $7 million (hard cost.)
PRYOR CREEK GOLF CLUB – PRYOR, OK
Description: This project involves an 18-hole addition and clubhouse
relocation to the existing course within the 800 acre site. In addition
to a new clubhouse and new 18 holes, the existing course will be
rerouted and renovated into the best nine holes along the spring fed
creek. A complete learning center and First Tee facility will be located
at the “new” clubhouse location. This project will be phased over a few
years and will eventually include various residential areas as well as
parks and nature trails. Budget: $8 million.
|